Install rear calipers and connect ebrake.
Install rear sway bar.
Install inner console and trim.
Evacuate and charge AC system.
Wrap a portion of a wiring harness that had the plastic sheathing melted away.
Install the firewall heat shield.
Finish coolant fill.
Check and tighten rear suspension components.
Install air intake and filter housing.
Install cruise vacuum canister and engine bay cooling tubes.
Steve and Jason working with the C500 and the front battery connection.

Jordan and Jason connecting tank to engine fuel lines.

Jason, Steve and Mike trying to locate a ground connection point for the front mounted battery cable.

Mike and Steve both agree that it's not long enough to reach that connection point.

Finally! The starter is installed. When the 3.4 block was drilled and tapped for the starter, it wasn't in proper alignment. The starter was difficult to install, but with all hands on board, we finally got it.

After all that work, it Barked At Us. A little starting fluid in the intake and it fired but died. So add to the To Do List, a new fuel pump, which Mike already has on hand.
Others that were involved but camera-shy were Scott and Dave.